Description:
Thema: Bauablauf
Bauzeitenplan, Kostensummenkurve, Bauzeitplanung mit Zeitbedarfswerten
anhand 2er Übungen
author(s):
(only for registered users)
file size:
413.25 Kb
File format:
.pdf
Downloads:
76
License types:
This download is available under the following license terms:
  • Legacy License

    The Legacy License grants the User the following use:

    • To use the content provided solely for private, non-commercial purposes.
    • No transfer, delegation or sub-licensing.

    ➔ License terms in detail

Start download
Ratings (2)Ø Rating: 1.50High Rating: 2Low Rating: 1
1 votes (50.0% total votes)1 votes (50.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)0 votes (0.0% total votes)
12345678910

Comments: (2):

mbf200602.07.2009
Rating: 1

Ich hätte vorher die Kommentare lesen sollen, was soll das bitte sein eine Studiearbeit doch nicht etwa?

mbf2006 has at Seminar Papers 1 objects with a user's average rating 1.0.

Nibbrig16.04.2009
Rating: 2

Nur die Excel-Tabellen als Pdf, ohne irgendeine Form der Erklärung, was man gemacht hat und wie man zu seinen Ergebnissen gekommen ist, läßt keine Chance nachzuvollziehen, was in dieser Studienarbeit eigentlich genau gemacht wurde. Auch die Richtigkeit aller Eingaben ist so natürlich nicht nachprüfbar.

Nibbrig has at Seminar Papers 1 objects with a user's average rating 2.0.

Sign in with your archinoah Account

Remember Me

Use this option only on a private computer where others do not have access.

Lost password? | Create an Account